Date of Birth: 16 December 1967    Residence: Belgrade, Serbia

📨paviclazar@gmail.com

Education: Faculty of Civil Engineering, Belgrade University, Serbia

Membership of Professional Associations: Engineers Chamber of Serbia

– licence no 310244603 for designing

– licence no 410905605 for construction

Languages:  🇷🇸  🇬🇧  🇷🇺  


Construction of the Bridge over the Sava River at Sremska Raca on the Highway Belgrade (Serbia) – Sarajevo (Bosnia and Hercegovina)
LOT B3.2 – Belgrade Bypass -Construction of the Bridge over Sava River near Ostruznica

Chief Engineer

Construction of road bridge for second lane of the highwe. Bridge structure consists of concrete approach bridge  length of 600m (16×37.5m) on the left river bank, main steel structure over river length of 583m (88+99+99+198+99m) and concrete approach bridge length of 800m (23×30+17.5+3×25+ 17.5m) on the left bank.Value of the project is 30 milion euros.


Construction of the Zezelj Bridge over Danube in Novi Sad – Serbia

Construction Manager

Construction of new road- railway bridge with spans 27+180+220+48m. This include two arches with ties and diagonal hangers and in main spans and box girders in approach spans. The height of arches are 34m 42m respectively.   Value of the project is 55 milion euros.


Construction of  new residential building Juzni Bulevar 72-76 at Belgrade – Serbia

Project Manager

Project Management over construction of multistorey residential building. Total surface is about 10,000 m2 which includes: 2 underground levels (garages), retails units in ground floor, parking space on the high ground floor and 8 floors with apartments.


Construction of  new building and tower for Airport Control Centre at Kraljevo Airport – Serbia

Supervisor for Civil Works and Structures

Supervision for construction of new Airport Flight Control building at Karljevo Airport. Total surface is about 1500 m2. Building facility includes tower 30m high. “Smart house” concept is accomplished by means of all integrated automation systems.


Construction of  new Area Flight Control Centre Belgrade – Serbia

Supervisor for Civil Works and Structures

Construction of new building for Area Flight Control Centre involves electrical power substations, UPS rooms, HVAC substation, underground garage, technical room, controlor’s room with 24m span and 36m length, providing open space with no visual obstacles and antenna tower. Building total surface is approximately 9000m2. 4500m3 of concrete, 1000t of reinforcement and 100t of steel are built in structure. “Smart house” concept is accomplished by means of all integrated automation systems.


Reconstruction of  building and tower for Airport Flight Control Centre at Podgorica Airport – Montenegro

Supervision Consultant

Scope of reconstruction works include construction of additional floor, providing required space for employees and new equipment. New superstructure is made of steel frames added over existing building, covered with steel panels.


Construction of  new building and tower for Airport Control Centre at Batajnica Airport – Serbia

Supervisor for Civil Works and Structures

Supervision for construction of new Airport Flight Control building in Batajnica near Belgrade. Total surface is 1028 m2. Building facility includes tower 24m high. “Smart house” concept is accomplished by means of all integrated automation systems.


Bridge over Tisa River in Ada – Serbia

EUROGARDI – Senior Design Engineer for Steel Structure

Design of roadway bridge across Tisa River, with spans 2×25.8 + 90.3 + 4×25.8m, having a single A-shaped pylon. The dismantled steel bridge structure (from old bridge in Wilshoffen, Germany) is incorporated in new bridge.


Reconstruction of  Sloboda Bridge in Novi Sad – Serbia

Assistant Bridge & QA Supervision Engineer

Supervision for reconstruction of Cable Stay Sloboda Bridge with spans 60+60+371(main span)+60+60m. This involves main steel three cell box girder span, two approach composite box girder span (each 60m), 4 reinforced concrete bridge piers, two pylons, stay cables in single plane, asphalt pavement  of bridge deck. Value of project is 33 million euros.


Highway Driving  Real Time Simulation – Video Game Production

Leading Designer

3d modelling and visualisation of surfaces and topography for real time 3d interaction highway simulation.


Nitrogen Factory Pancevo Reconstruction – Serbia

Senior Design Engineer

Design of various conveyor belt and transportation bridges for transport of raw coal and disposal of waste material – conveyor belt bridges.


Power Plant ‘Nikola Tesla B’ Reconstruction – Serbia

Assistant Design Engineer

Design of steel containers for coal  for power plant.


Bridge over Wisla River in Plock – Poland

DELING

Assistant Design Engineer

Design of road cable stay steel bridge over Wisla (main span 350m). Details development of bearings and expansion joints.


Competition for Bridge over Boka Kotorska Bay – Montenegro

Professor Nikola Hajdin and Associates

Assistant Design Engineer

Design of road cable stay steel bridge over Boka Kotorska bay (main span 450m). Main structure consists of box girder with aerodynamic shape and orthotropic deck plate. Main girder is supported with cables in two planes anchored in two concrete diamond shape pylons.


Shuwaikh Show Room Construction – Kuwait

PROPYLON Engineering Group

Assistant Design Engineer

Refurbishment of reinforced concrete building structure using prefabricated pre-stressed elements.


Various Marine and Waterfront Projects – Serbia

Enterprise for Waterways PIM

Assistant Engineer

Various offshore marine structures comprising breakwaters, waterfronts, quay walls, harbours, marinas, dredging and reclamation works.